the windows and installation were completed as expected with only a few minor exceptions. The time to get the windows from ordering to receipt was over 4 months
make them use dust screens to prevent tiny aluminum shavings from being blown all over in your house. Have a pint of exterior trim paint ready for them to touch up. You tell them which windows to change the next day so you can prep just that portion of your house. 20 windows took 4 days. 1 screen was warped
Iveriaalliance
United States
Pacific Radio Electronics
3031 Thornton Ave 91504 Burbank United States
http://www.pacrad.com
DGO Tile
- 95843 Antelope, CA United States
http://tilecontractorantelopeca.com
socialsampling.com
http://www.socialsampling.com
Fiber for Dogs/Bern Dog Brand Products LLC
1055 E. Colorado Blvd. 91106 Pasadena United States