then left presumably with my food. I continued to watch as the driver went to the opposite side of town while time ticked away. The I watched as the driver made two other stops while my food got cold. When he finally arrived
the windows and installation were completed as expected with only a few minor exceptions. The time to get the windows from ordering to receipt was over 4 months
make them use dust screens to prevent tiny aluminum shavings from being blown all over in your house. Have a pint of exterior trim paint ready for them to touch up. You tell them which windows to change the next day so you can prep just that portion of your house. 20 windows took 4 days. 1 screen was warped
Made in Here
United States
http://madeinhere.co.uk
Pink Zebra Home
11756 Levittown United States
http://pinkzebrahome.com
Best Sidewalk Shed & Scaffolding
8808 Foster Ave 11236 Brooklyn United States
http://bestscaffoldings.com
Enchanting Travels
8400 E Prentice Ave, Suite 1500 80111 Greenwood Village, CO United States