the windows and installation were completed as expected with only a few minor exceptions. The time to get the windows from ordering to receipt was over 4 months
make them use dust screens to prevent tiny aluminum shavings from being blown all over in your house. Have a pint of exterior trim paint ready for them to touch up. You tell them which windows to change the next day so you can prep just that portion of your house. 20 windows took 4 days. 1 screen was warped
Mind Hawks
Saint No. 5, New Suraj Nagari, Abohar, Fazilka, Punjab 152116, India
https://mindhawks.in/
Limo Service Seattle
1420 5th Ave #2200, Seattle, WA 98101, United States
https://www.limoserviceseattle.com/
angusandoink.com
N/A
Green Light Depot
http://greenlightdepot.com
Back Breakers
1122 26th St SW 87124 Rio Rancho United States
http://back-breakers.com
i bought a meatcutter but the design of meat cutter is not the one im looking for